It has been 2 months already since I last posted.
In that time, we have managed to get some siding up on the house (we’re painting the 4×8 panels first before putting them up); the tile is laid and grouted on the dining room floor; the bathroom sinks are completed and we have hot water; and we’re getting ready to tile the bathtub first, then the shower. It won’t be long now.
The hybrid heat pump water heater is a very quiet and efficient system. It doesn’t have to run very much at all to keep the water temperature.
The kitchen will take a little while, but we have a refrigerator, a microwave, a toaster oven, and induction cooking units. We’ll be able to prepare meals easily.