Some of the bathroom floor tile has been laid down and grouted. The rest of the tile is ready to be laid.
As soon as we fill nail holes and touch up the paint on the trim, the toilet can be installed.
Today we came back from town with 20 gallons of paint. In 5 gallon buckets. We are ready to start the big push — get the house ready to move in. It’s been 2 years from the time we poured the footings for the foundation.