September 2016
We’re slowly getting the walls done. Most of what is still open is the bathroom area. There’s a lot of plumbing left to do here.
We have started on putting the drain system in to go to the septic tank. The kitchen sink, and the toilet (including provision for a second toilet at some time) will go there. All other water will go to a gray water outlet that drains into the area below the west wall of the house. It will be distributed to water the trees and bushes.