October – slow progress

We have started on the water system. The line is into the house from the pump shed, and all of the water filter system is hooked up and working. We will turn the water into the house later on.

Still working on taping and plastering where possible.

The other thing we are doing is reclaiming some maple flooring that was removed from a gymnasium. The flooring is attached to 2 layers of plywood, cut into 2 ft by 8 ft pieces. We have about 350 sq. ft. of this flooring. We want to pull all of the maple strips off the plywood, remove all the nails, and plane it to remove the old finish.

We will probably install it in our bedroom, and refinish it once installed. It will be a long process to get all of this done.