October sees the floor?

October 2015

Finally finished putting all the floor joists in place, and we have started putting down the subfloor. These 4×8 panels are hard to move into place and to get them to fit together. The tongues don’t want to go into the grooves.

My thumb was the first casualty of the process when I hit it with a 2-1/2 pound hammer. Ouch!!

The rains have started, and naturally the floor is far from water-tight, so we are getting a lot of water on the ground in the crawl space. Since we have already put down insulation and plastic sheeting, there is a lot of water standing in there. The space for the solar mass floor also is a big pool of water.