December – still slow progress

December 2016

Still slow progress.

I have built the cabinets for the bedroom closet, and installed them. We will be working somewhat better after Christmas.

Our daughter is coming again for the holidays, and we possibly can get some painting done.

I have gotten some of the water distribution system started, although that is a slow process. I can’t work in the crawl space for very long.

I now have the doors on to close up the crawl space. I still need to do the weather seal on them, but at least the space is enclosed. We will be circulating air into and out of it from the living area once that is done.

 