April – the roof is finally on

April 2016

The two of us spent 4 very busy days laying out and gluing all of the roofing membrane down, one section at a time. Trying to do an entire roll at once was an impossible task, so we cut it into sections and laid one at a time.

This seems to have worked very well.

Addendum – April 2017 –After a year, the roof show no signs of any problem with the seams in the sections. The glue is holding it all down very nicely.

We have also started collecting rainwater from the roof of the house. We’ve brought in a 6000 gallon tank and have transferred some water from our 4000 gallon storage to it.