July, 2015
We have started the house. We had a contractor come and pour the footings for the foundation wall. Then about 3 weeks later, I began laying concrete blocks for the foundation. It will enclose the perimeter, and also the solar mass slab. The space inside the slab area will be filled with dirt and rock, then gravel and the concrete blocks for the air channels. Then a slab will be poured over the top of the blocks.